First Article Inspection for Injection Molding: What the Report Must Show

A first article report for an injection molding tool is the document that decides whether the tool is accepted, and it should contain 14 to 20 dimensional characteristics measured on a production-representative shot rather than on the first shot off the tool. In a typical submission the measured values are held to a tolerance band of 0.05 to 0.15 mm depending on the criticality of the dimension, and every measurement is tied to the nominal dimension on the drawing with the actual measured value beside it.

For the numbers behind this, see injection mold manufacturer in China — it breaks down the same question with production data.

injection molding first article report PPAP documentation — First Article Inspection for Injection Molding: What the Report Must Show
A first article report is measured on a production-representative shot, not on the first shot off the tool.

What should a first article report contain for an injection molding tool?

Five groups of evidence. A dimensional report covering 14 to 20 critical dimensions, each with the nominal value from the drawing, the measured value and the actual tolerance. Material evidence, which is the batch or lot certificate for the moulding compound. Tool steel and heat treatment records for the core, cavity and any hardened inserts. A functional and cosmetic assessment against the customer standard. And the process record, meaning the fill, hold and cooling parameters and the cycle time that were used to produce the reported shot.

How many shots should be run before the first article is measured?

At least 30 shots, and a more defensible figure is 50 to 100. The reason is that the first shot off a new tool is not representative: the cavity dimensions change over the first few cycles as the tool takes up its operating temperature and the wear pattern establishes itself, and the early shots are also the ones most likely to be produced at a different temperature from steady state. Reporting a dimension measured on shot one is the single most common reason a first article is rejected, and it is the reason most often given for a rejection that the tool itself did not deserve.

We work through these calculations regularly at dfm checklist for injection molds, and publish the underlying data tables and method notes so buyers can check them.

Which dimensions are actually critical, and how do you choose them?

Choose them by function, not by drawing convenience. For a housing, that usually means the critical mating features, the positions of the mounting bosses and the overall envelope. For a fluid-handling part, wall thickness in the flow path and the dimensions around sealing features. For a cosmetic part, the visible surface flatness and the parting line alignment. The customer should sign this list before the tool is cut, because choosing it afterwards turns the first article report into a negotiation about which dimensions matter.

How does a first article report differ from a PPAP submission?

A first article report is a subset. PPAP adds the production part approval process elements: process capability studies, a control plan, the measurement system analysis for the gauges used, and a full production trial at the quoted rate. In injection molding the practical difference is that the first article confirms the tool works, while PPAP confirms the process is capable and repeatable. Automotive and medical customers usually require both, and the tooling supplier's first article report is the evidence the PPAP package is built on.

What questions to ask your injection moulding supplier

Twelve questions that separate suppliers who have built your part before from those who have built something similar. How many tools of this size have you built in the last twelve months? What steel grade do you specify for this wear pattern, and why? What cycle time do you model for this geometry, and on what machine? Where do you place the gate, and what is the reasoning? What cooling layout will you use, and how will you balance it? How do you control cavity-to-cavity variation? What is your first-article report format? What happens if the parts fail the criteria, and who owns the cost? How long do you hold spare inserts for this tool? What is included in the tool at handover? Who is the named engineer who will own this tool? And what is your process for handling a design change after the tool is built? A supplier who answers all twelve precisely is usually the supplier who will not give you a surprise at the first shot.

How to scope a supplier quotation so you can compare answers

Write the specification before you write the enquiry, and include six items that quotations otherwise disagree about silently. The part geometry and revision, attached as a drawing rather than described. The annual volume and the shot life the tool must deliver. The material grade, and who supplies it. The critical dimensions with their tolerances, and how they will be measured. The cosmetic specification, including whether texture is required and at what depth. And the delivery date, with the milestone structure you will accept. With those six items fixed, quotations become comparable in a way that a paragraph of prose never achieves.

Where this guidance comes from and where it does not apply

This guide reflects tooling work carried out in Guangdong and export supply relationships across Southeast Asia and Europe, with figures current to 2026. Three caveats are worth stating. Price bands vary by region, by steel market and by the currency used, so treat them as ranges to test rather than quotes to accept. Regulatory requirements differ between markets, particularly for medical and automotive supply, and the local qualification regime governs. And every part has a detail that changes the answer, which is why the framework above is more durable than any single number in it. Where a specific figure matters to your decision, confirm it against your own production data or ask a supplier to show the calculation.

Key figures at a glance

Report elementTypical requirementAcceptance basisCommon rejection reason
Dimensional report14 - 20 critical dimensionsDrawing toleranceMeasured on a non-representative shot
Material evidenceBatch / lot certificateCustomer specificationLot number not traceable
Tool steel and heat treatMaterial and treatment certificatesAgreed specificationHeat treatment certificate missing
Functional and cosmetic checkFit, function, cosmeticCustomer standardTested on the prototype tool
Process recordFill, hold, cooling, cycle timeAgreed process windowNo recorded process window

Frequently asked questions

How many shots should be run before measuring the first article?

At least 30, and 50 to 100 is more defensible for a production tool. The first shots from a new tool are not representative because the cavity dimensions and the thermal state are still settling, so a dimension measured on shot one will often sit outside a tolerance that the tool holds perfectly from shot 30 onwards.

Should the first article be measured on the first shot?

No. Measure after the tool has reached a stable operating condition, and record the cycle count alongside the measurements so the reader knows what state the tool was in. The same applies to the dimensional report on a prototype tool: a prototype is a validation tool, and its numbers should be labelled as such rather than offered as production evidence.

Do I need a full PPAP for a single tool?

Usually not on first submission, but the customer's quality agreement decides. The usual sequence is a first article report to release the tool, followed by a production trial and a PPAP package once the part is in production. Asking which document the customer wants before the tool is cut avoids the common situation where the tooling is delivered and the document requirement is discovered afterwards.

Key terms explained

First article report
The record of measured characteristics, material evidence and process parameters produced to demonstrate that a tool meets its specification.
PPAP
The production part approval process, a structured evidence package covering dimensional, material, capability and process control requirements.
Critical dimension
A characteristic whose variation affects fit, function or appearance, and which therefore has to be measured and controlled.
Lot traceability
The ability to tie a specific production batch back to its raw material certificate and its process record.
Process window
The defined range of process parameters within which the part can be produced repeatably.

Sources and further reading

  • First article and PPAP documentation practice for injection tooling, 2025-2026
  • Engineering handbook: Plastic Injection Moulding — dimensional reporting, process capability and sample approval

Shiny Mold is an injection mould engineering and manufacturing partner based in Dongguan, China, with more than 23 years of experience building custom tools for automotive, medical, consumer electronics and industrial customers. We publish the same cost and process data we use internally.

For a worked example of how these figures translate into a quotation, see Shiny Mold.

If you want the same process applied to your own part, our engineering team covers it here: iso certified injection mold manufacturer.